Example line
A real line, start to finish
A four-machine canning line runs at 75% uptime. Here's what LineIQ finds, the fix it prices, and the reports you'd take to your capital review. Every number comes from the same engine as the calculator.
The calculator, filled in
Three steps from your machines to a payback period.
Step 1: Describe the line
The product, the schedule and what each unit earns. Then each machine's speed, how often it stops and how long repairs take.
- Product
- 12 oz beverage cans
- Shifts
- 2 × 480 min
- Operating days
- 250 / year
- Profit per product
- $0.50
| Machine | Max rate | Failures | Repair | Uptime |
|---|---|---|---|---|
| Depalletizer | 350 ppm | 1 / hr | 5 min | 91.7% |
| FillerBottleneck | 300 ppm | 0.5 / hr | 5 min | 95.8% |
| Labeler | 350 ppm | 2 / hr | 2 min | 93.3% |
| Casepacker | 380 ppm | 1 / hr | 5 min | 91.7% |
Step 2: Pick where to add accumulation
LineIQ ranks every spot between machines. This example buffers 5 minutes right after the bottleneck, for $150,000.
- Depalletizer350 ppm · 91.7%
- Filler300 ppm · 95.8%Buffer 5 min
- Labeler350 ppm · 93.3%
- Casepacker380 ppm · 91.7%
The reports it produces
One click turns the line into a PDF. Choose the one-page summary or the two-page detailed version.
The headline case on one page, for a quick capital review.
- Line flow with the accumulator
- Machine table and uptime
- Investment and payback
Now try it on your line
Free account, no credit card. Start blank, or open this example and change the numbers.
