ROI Calculator

Step 1: Product

What runs on this line. Optional, but dimensions help us suggest the right accumulator.

Step 2: Machine line-up

Enter each machine's rated speed and how often it stops. We find the bottleneck.

Only add accumulators already on your line. We'll recommend new ones in your results.

Build your line

Add each machine in order, with its rated speed, stops per shift and repair time.

Start from an example

A worked example line. See the bottleneck and what fixing it is worth, then change any number to match yours.

Step 3: Operating schedule

Shifts and profit per product turn lost throughput into money.

Operating days per year
250 days

Step 4: Improve the line

Add accumulators or equipment upgrades and see what they're worth.

Decoupler Solution

Add at least 2 machines to configure an accumulator

Line balanceAdvice only
How full to run each accumulator, and how fast the machines around the bottleneck need to run. These don't change the results above.

Add an accumulator to the line (in step 2), or select one above, with at least one machine on each side. The fill level and speed advice will appear here.

Step 5: Compare scenarios

Save versions of this line side by side, and add notes for the PDF report.

Scenario Comparison

No scenarios saved yet. Configure your line and save it as a scenario to compare different configurations.

Results

Add your machines to see the bottleneck, line uptime and payback here.